The hull and deck have been primed and now have two coats of AWLGRIP primer. The mahogany coaming was laminated and formed on a jig with a vacuum bag. The floorboards are mahogany and installation is complete except for the hatches.
Big Pond Boat Shop is located in Martins River, Nova Scotia. The Shop builds boats; power, sail and human powered to 30` www.bigpondboatshop.com
Tuesday, 25 October 2011
Wednesday, 12 October 2011
Marsh Cat deck
The centreboard and rudder are built and ready to be painted. The deck is sheathed with 6 oz fibreglass cloth and epoxy resin and will be primed and topcoated with AWLGRIP and Griptex non-skid. Next will be the cockpit coaming and the toe rail.
The birds mouth mast has been glued and clamped, and the gaff and boom are in the varnish shop.
Saturday, 1 October 2011
Tuesday, 20 September 2011
Marsh Cat Interior
The interior of the boat now has buoyancy tanks, mast step, centreboard trunk, floors and deck beams. The boat will now be painted inside before the deck is installed. Work is starting on the spars which will be constructed from selected spruce and will be of birds mouth hollow construction
Saturday, 27 August 2011
Hull of Marsh Cat begins to take shape
The sheer clamp has been laminated to the shape of the hull then installed, creating the sheer line. The first deck beam is installed, and the carlin for the coaming is in place, Some of the floors are glued and filleted in place.
Thursday, 18 August 2011
Marsh Cat turned over
Tuesday, 16 August 2011
Marsh Cat is primed
Its amazing what a coat of primer does for a new hull. Today we primed the hull and put a first coat of antifouling on the Marsh Cat hull. Tomorrow we will turn the hull over and start the interior.
Subscribe to:
Posts (Atom)