Tuesday 13 March 2012

Shellback continues

The Shellback dinghy is planked, and the interior flotation tanks are in place. The aft tank is now covered, and the foward tank is having the mast step installed before the seat cover is installed. The daggerboard case is being fitted. 

Here is Keith at the Halifax International Boat Show last month with the Marsh Cat.